Results by Google

DOT's 2008 Beltline Improvement Outline

Road Constructions For 2008, 2010-2012

Below is an outline of the scheduled projects that the Wisconsin Department of Transportation will undertake in conjunction with the Beltline improvement project:

Old Sauk 2008
  • Add Additional left turn lane on NB ramp
  • Add advance left turn lane for WB traffic between High Point and ramp terminal
  • SB exit ramp will have one left turn lane and two right turn lanes
  • Auxiliary lane extensions both north and south between the west ramp terminals and Excelsior Drive
  • NB exit ramp will have two left turn lanes and one right turn lane

Mineral Point 2008
  • Add triple left turn lanes to NB exit ramp
  • Extend NB exit ramp right turn lane
  • Add WB auxiliary lane between Target entrance and Beltline
  • Add SB exit ramp dual right turn lanes

Seminole Highway 2008
  • Provide signals and lane reconfiguration work at both ramp terminals and approaches
  • Bike pedestrian lane only provided on west side of bridge

Park Street 2008
  • Add additional left turn lane on the WB off ramp to provide one right turn

Park Street 2010/2012
  • Removal of existing EB on ramp and reconstruction with new alignment
  • Signalize NB movement at EB off ramp and Park Street
  • Removal of NB off ramp (loop ramp in SE quadrant of current configuration)
  • Relocation of frontage road to make room for SB and new NB exit ramp
  • Realign SB/NB exit ramp to straighten out
  • Create dual left turn lanes and connection from SB to NB terminal
  • Lengthen acceleration lane from EB on loop ramp through the bike and pedestrian bridge
  • Lengthen decal lane on Park Street to WE on ramp

Rimrock Road 2008
  • Add right turn lane on WB off ramp to provide for dual right turn lanes and one left turn lane

Between Rimrock and Park Street
  • Extension of auxiliary lanes on both side

U.S. Highway 51/Stoughton Road 2008
  • Add a third left turn lane on the EB off ramp
  • Add additional left and right turn lane on the WB off ramp

Fish Hatchery 2010/2012
  • Removal of remaining loop ramp from NB Fish Hatchery to WB Beltline traffic (NE quadrant of interchange)
  • Alignment of ramps on the north side of the interchange
  • Widen bridge to accommodate dual left turn lanes

Between Old Sauk and Gammon Roads 2008
  • Mill and pavement overlay both EB and WB lanes up to ramp terminals at each end
Links We Like
Sponsored Content
You can pick your friends, but not your family -- or your neighbors. Here's what you need to know about how to deal with yours. More Details
Find out what a sputtering economy and an increasingly difficult to crack job market means to you. More Details
Are you often tired or rushed in the morning? Give your morning habits a makeover, and start the day feeling positive and energetic instead. More Details
Find out exactly what Medicare covers with our easy-to-use Medicare coverage tool. More Details
Advertise With Us Advertise With Us

Survey

Are you worried about H1N1 this flu season?